CarcinogenicityAcceptedBeyond the letter
No carcinogenicity studies
Why: Proposed indication and short duration of treatment · Other reason
“No carcinogenicity studies have been conducted. Considering the proposed therapeutic indication and the proposed duration of treatment, this was considered a satisfactory approach.”
✓ VerifiedEMA assessment report, p. 32Source ↗ Juvenile toxAcceptedBeyond the letter
No juvenile animal studies
Why: Application covers adult patients only · Other reason
“No studies in juvenile animals have been conducted. The lack of such studies is accepted, as the present Marketing Application Authorization refers to the use of Rezzayo in adult patients only.”
✓ VerifiedEMA assessment report, p. 37Source ↗ Safety marginAccepted with a conditionBeyond the letter
Male reproductive organ effects in rats with a low (2-fold AUC) safety margin
Why: Effects on male rat reproductive organs and spermatogenesis described in the SmPC
“Based on human exposure data and animal toxicokinetics data extrapolated from the 4-week repeated dose toxicity study, there is a low safety margin (2-fold, based on AUC) for the effects observed in male reproductive organs.”
✓ VerifiedEMA assessment report, p. 32Source ↗ “As mentioned before, information on the effects observed on male rat reproductive organs and spermatogenesis has been adequately included in the SmPC.”
✓ VerifiedEMA assessment report, p. 38Source ↗ Safety marginAccepted with a conditionBeyond the letter
Intention tremors in monkeys with relatively low safety margins (2.53 to 6.15-fold AUC)
Why: Intention tremor information included in SmPC section 5.3
“Considering that the available information suggests that rezafungin may induce dose-dependent intention tremors with relatively low safety margins (2.53 to 6.15- fold, based on systemic exposure [AUC0-168] from the 13-week [NOAEL of 10 mg/kg/dose, since intention tremors were observed at ≥30 mg/kg/dose] and 6 months study [NOAEL of 30 mg/kg/dose, the maximum tested dose])”
✓ VerifiedEMA assessment report, p. 37Source ↗ “The information included on intention tremors in section 5.3 of the SmPC is adequate.”
✓ VerifiedEMA assessment report, p. 37Source ↗